Plant and Machine Data :: basic :: EN
cronetwork Plant Data Collection PDC and Machine Data Collection MDC support you at the foreman and shop floor levels in your collection of order data and customer-specific feedback processes, e.g., progress, stack and team feedbacks. The features encompass:
Master data
- Work center groups, scheduling areas, work centers, terminals, authorizations, persons, disruption reasons and scrap reasons
Order management
- Selection, parameterization, data storage
Terminal parameterization via topic-oriented parameterization
Interfaces
- Interface parameter, interface run, interface troubleshooting
cronetwork Machine Data Collection
- Concept, parameterization of the MDC Server
Creating & using a Terminal portal (I4.0 Portal)
Practical examples
Parameterization of an MDC-capable terminal that generates automatic disruption and production postings using the MDC simulator.
- Simple feedback process with output & scrap quantities along with scrap reasons
- Activation of team and stack feedbacks (parallel processing of multiple operations)
Kursinhalt
-
Kursmodul DAY 1/2 :: Remote access (online training) :: Plant and Machine Data :: basic Kursart: Ereignis
Level: basic Duration: 1,5 days This course is only being offered as EXCLUSIVE TRAINING! Course location: You have the choice between Online training (remote training in the Onlilne...
-
Kursmodul DAY 2/2 :: remote access (online training) :: Plant and Machine Data :: basic Kursart: Ereignis
-
Kursmodul Access to online demo system ON THE COURSE DAY :: link & introduction
-
Kursmodul Course materials - Plant and machine data :: basic
-
Kursmodul KURSUNTERLAGEN :: Betriebs- und Maschinendatenerfassung :: basic